THE QUICK TAKE

A lower simulated electricity cost need not mean less energy; the tariff spread, prediction error and completed-work denominator remain essential.

Scheduling against a changing electricity price

TARDIS proposes power-aware scheduling across time and multiple HPC centers. It predicts job power with a graph neural network, scores queued work using cost and resource conditions, then dispatches jobs subject to node and power budgets. Its author presentation describes the same system and evaluation; it is supporting material, not an independent deployment report.

The question is different from finding the lowest GPU power cap. A job can consume similar energy yet cost less if it runs during a cheaper tariff period. Conversely, a lower instantaneous power reading can accompany a longer execution and fail to reduce energy. Scheduling cost, electrical consumption and completed work therefore need separate records.

The savings belong to a trace simulation

The paper evaluates trace-based simulations using PM100 job records. A temporally ordered portion trains the prediction model; the remaining records supply different workload scenarios. This is not a report of measured invoice savings from a deployed federation of production centers.

The authors report cost reductions up to 18% for temporal scheduling and 10–20% for multiple sites, with comparable throughput under their evaluated conditions. Those ranges should remain attached to the chosen workload, pricing and power budget. They do not establish that an arbitrary site with a flat tariff, different arrival pattern or strict execution deadline would obtain the same saving.

The evaluation sets a threefold peak/off-peak price difference. For one modeled site, the rates are $0.12 and $0.36 per kWh. These are simulation inputs chosen to test shifting opportunities, not current quotations for a reader’s electricity contract. The price spread creates part of the opportunity being measured.

Prediction error affects feasibility as well as cost

The scheduler uses predicted job power to decide what fits within an instantaneous budget. A prediction error can therefore alter admission and placement, not merely the final accounting line. A useful replay should compare predicted with measured demand and show how errors near a limit are handled.

A waiting-time term raises the priority of older jobs. That is a mechanism intended to discourage starvation, rather than proof that every deadline or fairness requirement is satisfied. Similarly, assigning work to a center does not demonstrate that its data, software licenses and accelerator requirements can actually be moved there. Those constraints need explicit treatment in a deployment evaluation.

What a meaningful replay would preserve

Keep the arrival trace, requested resources, power-measurement boundary, tariff calendar and center-specific limits fixed across policies. Compare against the actual existing queue policy, and retain rejected or late jobs. Measure energy and money separately, alongside completed work, completion time, waiting tails and allocation across users.

Test a smaller price spread and a case with little scheduling flexibility. These controls show whether the advantage comes from generally improved packing or from delaying expensive work into cheaper periods. Any data-transfer or restart cost belongs in the system boundary rather than disappearing from the comparison.

The electricity-accounting guide explains how to connect energy to the applicable bill. The power-cap experiment guide covers a different control variable. TARDIS provides a concrete scheduling proposal and simulation evidence; it does not supply a universal electricity-saving percentage or replace a site’s own tariff and workload record.

Earn rental income from GPUs

Have idle GPUs or looking to fund AI infrastructure? Retrivium finds a rental platform, sets up the server and helps you assess income and costs with a pilot.

Explore GPU hosting