In this article
Use imagery and generation estimates to narrow the survey checklist and measure avoidable rework after the site visit.
A solar installer can prepare a preliminary quote from mapped roof geometry and still discover a mismatch when the surveyor arrives. A 2027–2029 product scenario is a quote review service that makes the roof assumptions inspectable and highlights which ones need field measurement before the installer commits.
Verify building identity first
Google Solar Building Insights can return roof segments and panel configurations for a building near the requested coordinates. Retain the resolved coordinates, imagery date if available and returned roof segments. Ask the installer to confirm the intended structure. A nearby outbuilding can produce a plausible estimate for the wrong roof.
Record inputs to the generation estimate
PVWatts documents inputs such as system capacity, tilt, azimuth and losses. Store the inputs and model version behind each quote range. Keep fields collected from maps separate from site measurements and installer assumptions. Show how a changed roof segment or excluded area affects the draft instead of quietly overwriting the result.
Create a useful site visit
Prepare a short list of facts to confirm, such as whether a planned segment is obstructed or an image predates a roof extension. Include source imagery and the affected portion of the draft quote. The surveyor records observed dimensions and limitations. Final structural and electrical decisions remain with the responsible professionals.
Measure revisions after the visit
Replay old quotes and compare their roof assumptions with later surveys. Record where an earlier question would have changed the quote, and how much time the installer spent recalculating. On live work, track site visit time, significant quote revisions and customer acceptance separately. A faster draft alone can move effort downstream.
Test another installer territory
Repeat demand would show up if an installer pays to add another branch with usable imagery and similar quoting practice. The case weakens if unavailable or outdated images make almost every draft unusable, or if the buyer already receives the same review from design software. Track geographic coverage before pricing broad rollout.
Primary sources
Related reading
Earn rental income from GPUs
Have idle GPUs or looking to fund AI infrastructure? Retrivium finds a rental platform, sets up the server and helps you assess income and costs with a pilot.