TECHNOLOGY

A mailbox update is not proof that the delegated task is done

In this article
THE QUICK TAKE

Treat agent activity, returned evidence and accepted deliverables as distinct states; a wait or create event alone does not prove completion.

Ask what changed in the business task

A coordinator receives an update while waiting for a specialist. The update may contain a question, partial finding or lifecycle notification. Showing the parent task as complete at that point substitutes communication for acceptance. The Responses guide describes wait_agent as waiting for an update in the caller’s mailbox. It does not define a task-specific condition such as “all required database consumers were inspected.” The application and root agent must still evaluate the actual deliverable.

Use an evidence-bearing state model

A proposed task ledger separates assigned, active, evidence returned and accepted. It also allows blocked, failed and explicitly partial outcomes. For a database migration audit, “evidence returned” means there is a report with the inspected revision and references. “Accepted” means the report answers the required compatibility question and exposes unresolved cases. The vocabulary need not become a large workflow framework. Its purpose is to prevent an arbitrary status string or a polite closing message from deciding business correctness.

Read coordination items narrowly

The Agents API documentation explicitly warns that a completed create or wait action does not mean the subagent finished its task. It also notes that coordination items may omit message content and that the event stream is not a full conversation transcript. Consequently, a dashboard should not infer comprehensive investigation coverage from coordination counts. Fetch saved items or inspect the returned artifact where necessary, then record the narrower evidence that actually supports the completion claim.

Test a convincing incomplete result

Supply an audit task with a required error-handling case and let a fixture report only the ordinary path. Check whether the root accepts a fluent summary or notices the missing requirement. Also test a worker that asks for clarification while remaining active. The SDK results guide provides a related distinction: approval interruptions can leave final output empty because the run is unfinished. These are proposed acceptance tests; no observed failure rate or universal automatic completion detector is claimed.

Make the final status reproducible

For the period ending November 6, 2026 and scenarios through May 6, 2027, preserve the assigned scope, artifact identity and acceptance evidence alongside lifecycle observations. Handoff evidence defines a useful returned object; Aggregation rules define what the parent promises. A reviewer should be able to see why a result was accepted without reconstructing every message. Reliable completion comes from satisfying that promise, rather than from an agent appearing idle or a wait operation returning successfully.

A possible six-month capability

An editorial scenario through May 6, 2027 is a coordinator that advances a long task automatically when evidence-bearing completion conditions are satisfied. A ledger connecting obligations to accepted artifacts supplies the mechanism. It needs machine-checkable criteria for the selected task. If coverage remains an untestable natural-language claim or missing mandatory cases routinely pass the gate, the forecast of reliable autonomous stage advancement is weakened.

Earn rental income from GPUs

Have idle GPUs or looking to fund AI infrastructure? Retrivium finds a rental platform, sets up the server and helps you assess income and costs with a pilot.

Explore GPU hosting
← All articles