In this article
Recover coordination by reconciling saved agent work with accepted artifacts and outstanding obligations before admitting replacement assignments.
Recover the task rather than the conversation’s mood
A client process disappears after several specialists produced reports but before the final integration. A replacement coordinator needs to know which evidence was accepted and what remains. A fluent summary saying “research mostly complete” is insufficient: it lacks the artifact revisions and outstanding obligations needed to avoid duplicate work. The research question concerns the application’s recovery ledger, rather than whether a model can imitate the previous coordinator’s tone or reconstruct every intermediate reasoning step.
Use saved work before sending new work
The Agents API recovery guide instructs clients to inspect the session, turn and saved items after uncertain failures. A completed result should be used; an active turn should be followed. It also warns that failed turns may already have changed files or used external tools. These are concrete reasons to reconcile observed work before appointing replacement specialists. A coordinator failure is not evidence that every child result or external effect disappeared with the client process.
Separate observations from acceptance
The events guide provides saved items and distinct subagent histories, with pagination when listing records. A recovery ledger can reference those observations while separately recording whether a report satisfied its assigned question. Preserve task revision, accepted artifact, unresolved findings and operation outcomes. This is a proposed application record, not a claim that a single API field reconstructs the whole business workflow. A saved message remains evidence to inspect; it is not automatically an accepted migration decision or reviewed deliverable.
Test the lost-integration interval
A proposed fault test stops the client after reports arrive but before the final answer is stored. Restart with the same task ledger and inspect saved work. Check that valid evidence is reused, pending reviews remain pending and only unfinished assignments restart. Include a late child result to expose races with replacement work. The multi-agent guide identifies the main agent as the source of the combined result, so recovery must still preserve integration obligations rather than treating a collection of child histories as completion.
Leave an accountable recovery decision
For scenarios through May 6, 2027, record why each task was resumed, replaced or already complete. Artifact handoffs supply the revision discipline; Parent result contracts supply acceptance semantics. No recovery benchmark is claimed here. A defensible restored coordinator can explain which observations it trusted and which work it repeated. That makes a client restart an auditable transition, instead of an invitation to recreate a reassuring narrative while losing completed effects or unfinished verification.
A possible six-month capability
An editorial scenario by May 6, 2027 is a coordinator replacement that reuses verified stages after client loss and resumes only unfinished obligations. Saved histories, pagination and an external acceptance ledger provide the mechanism. It requires consistent artifact identity and visible operation outcomes. Missing pages, unrecorded acceptance or unknown side effects are counterevidence: recovery then needs renewed inspection rather than automatically trusting a reconstructed story of progress.
Earn rental income from GPUs
Have idle GPUs or looking to fund AI infrastructure? Retrivium finds a rental platform, sets up the server and helps you assess income and costs with a pilot.