In this article
Pause affects the current main task; delegated tasks and recurring schedules require separate inspection and stopping.
Pause has a specific scope
The controls guide distinguishes pausing the dot, stopping a delegated task and canceling a schedule. Pause stops the current main task. It does not stop every delegated task or cancel future scheduled runs.
This is a product-specific lifecycle distinction. A user who pauses the main conversation can reasonably expect that work to stop, but should not infer that every related execution has inherited the same state. Treat the visible control according to its documented scope.
Inspect the delegated work separately
Activity provides access to delegated tasks, their progress and results. The guide directs users to open the relevant task there to stop it. In a hypothetical campaign shutdown, a background copy draft and a data analysis can have separate task states.
Determine which tasks belong to the campaign and which serve unrelated responsibilities before stopping them. A shutdown instruction should not become a reason to discard useful work for a different project merely because the same dot coordinated it.
Future runs live in Scheduled
The tasks guide explicitly separates stopping active work from canceling a schedule. A recurring assignment can start again later if it remains enabled. Open Scheduled to inspect the timing, instructions and destination of the task being retired.
For the campaign example, canceling its daily briefing does not necessarily stop a briefing already being prepared. Conversely, stopping the active draft does not retire tomorrow’s recurring run. These are two lifecycle questions with different evidence.
Stopping does not reverse completed actions
The controls documentation says stopping work does not undo completed actions. If a message was already delivered or a document already changed, recovery must consider that actual state. Do not report an undone consequence merely because the generating task is now stopped.
The tool-calling guide helps separate execution from intention. Request identity helps establish which outputs were produced before the stop. Neither requires pretending that all connected services support automatic rollback.
Possible next capability: coordinated shutdown with visible scope
Our editorial scenario through May 6, 2027 is a coordinated shutdown workflow that identifies a responsibility’s active children and future schedules, then applies the appropriate stop operation to each authorized target. A useful interface could show what will stop and which completed consequences remain, while retaining the separate semantics documented today.
This is a possible capability, not an announced universal-stop control or automatic rollback. It needs accurate task relationships and protection against stopping unrelated work. A supposedly retired campaign that starts another scheduled run would contradict the scenario, as would stopping another project’s task. The practical expansion would be ending an ongoing responsibility coherently without pretending that one current Pause button already performs every required operation.
Earn rental income from GPUs
Have idle GPUs or looking to fund AI infrastructure? Retrivium finds a rental platform, sets up the server and helps you assess income and costs with a pilot.