In this article
A bb schedule needs an explicit timezone and available hosts; its documented missed-run recovery is a single catch-up, not a replay of every elapsed interval.
A scheduled wall-clock time and an actual execution time are different facts. bb schedules depend on an available server and execution machine, so timezone and host state belong in the explanation. A missed run also needs a defined recovery meaning instead of an assumption that every elapsed interval will be replayed.
A schedule is interpreted in a time context
Imagine a weekday report intended for the start of a team’s working day. The intended timezone belongs with the schedule, because the same clock label has different meanings in different places. The official scheduling guide includes timezone in the setup description. A useful report records the configured time context and the next planned occurrence. This makes a timing discrepancy inspectable before blaming the agent’s reasoning or repeatedly changing the task’s prompt.
Execution requires a host that can run
The guide states that scheduling does not wake a sleeping computer. A valid schedule can therefore pass its intended time while no process is available to perform the job. The remote-work guide provides the related distinction between client access and execution machines. In the report example, a phone receiving other network traffic does not establish that the workstation is awake. Diagnose the scheduler’s availability and the agent host separately from the content of the report that was supposed to be produced.
A missed interval is not a complete replay log
The current guide says a missed run happens once when the machine returns. That behavior should not be described as a replay of every missed interval. For a state-summary job, a fresh report may sensibly describe current conditions. For a historical accounting job, the application may need to query the missing period explicitly. This is an engineering consequence of the documented recovery shape: catching up a trigger and reconstructing all historical work are different responsibilities.
Compare the plan with an observed run
The guide recommends a direct run as part of diagnosing schedule problems. If the same job works when invoked now, the earlier failure may concern timing or machine availability rather than its task logic. Record the planned occurrence, actual start and observed outcome as different events. This avoids labeling a late successful report as an on-time execution. A clear account also gives the developer a basis for deciding whether the chosen host fits the job’s required availability.
Primary sources
Related engineering context: Choosing an AI development stack; Git state and undo.
Earn rental income from GPUs
Have idle GPUs or looking to fund AI infrastructure? Retrivium finds a rental platform, sets up the server and helps you assess income and costs with a pilot.