In this article
The inspected normal base path invokes the sensor update and moves the schedule into the future; it does not loop to reconstruct every missed nominal sample.
A configured rate does not recreate unobserved history
A twin advances simulation time in relatively coarse increments while a sensor has a faster nominal schedule. The dataset exporter expects a sample for every period and assigns missing intermediate timestamps to repeated current observations. That creates invented acquisition history. Inspect how the sensor scheduler catches up when several nominal periods have elapsed. A frequency setting describes an intended schedule; it does not guarantee that the implementation reconstructed the world state at every missed instant.
Read the normal base scheduling path
The inspected Sensor implementation checks whether the supplied time has reached nextUpdateTime, subject to activity, forcing and triggered-mode conditions. In the ordinary nonforced positive-rate path, it invokes the underlying update and advances the next scheduled time. If the schedule remains behind, it skips the missed periods so the next time lies in the future. This base path does not loop through historical states to generate each overdue nominal observation.
Separate rate definition from emission evidence
The SDF sensor schema defines update_rate as generation frequency and gives every-cycle behavior when unspecified. It does not supply a universal promise of historical backfill, wall-clock transport throughput or identical behavior for every sensor subclass. An underlying update invocation can have its own success and publication semantics. Record actual emitted samples and their source times rather than equating scheduler calls, transport arrivals and nominal periods. Forced and triggered updates need their own explicit interpretation.
Propose an overdue-schedule fixture
A proposed fixture should use distinguishable simulated scene states and pass update times that cross several sensor periods. Record supplied simulation time, underlying update invocations, resulting messages and the next scheduled time. Compare with fine-grained calls under the same nominal rate. Keep forced updates disabled when isolating the normal schedule. No sensor or simulation experiment was executed here, and no output rate or timing precision is inferred beyond the inspected scheduling logic.
Accept timestamps without fabricating samples
Retain sensor and scheduler revisions, nominal rate, actual update times and any identified skipped intervals. If the application resamples observations afterward, label interpolation or repetition as a derived operation rather than a newly acquired measurement. A temporal model trained on the output should be able to distinguish generated sensor data from filled gaps. Evaluate simulation-time cadence separately from wall-clock delivery, especially when the world runs slowly or pauses under external control.
Keep scheduler fidelity separate from sensor realism
The RH20T alignment guide explains a neighboring timestamp interpretation issue; software reproducibility supports preserving generation settings. Here acceptance identifies which nominal periods actually produced observations under the reviewed base schedule. It does not establish realistic exposure, noise, latency or physical sensor synchronization. Those properties require additional models and independent evidence after the generated observation history has been represented honestly.
Earn rental income from GPUs
Have idle GPUs or looking to fund AI infrastructure? Retrivium finds a rental platform, sets up the server and helps you assess income and costs with a pilot.