In this article
Meeting the controller’s scaled goal-time tolerance does not establish an unscaled task deadline; the timeout variable and the point where it is checked matter.
A successful slow trajectory can miss the task deadline
A manipulation task has an external elapsed-time requirement. The robot reduces motion speed, completes its trajectory and reports success under the controller’s tolerances. The application assumes its original task deadline was also met. That conclusion conflates physical elapsed time with the trajectory’s scaled progress. Define the outside requirement independently: its starting event, observation clock, end condition and response to expiry. A successful action result alone cannot identify which clock and acceptance policy the application actually enforced.
Speed scaling changes the trajectory time coordinate
The Kilted scaling guide describes virtual trajectory progress reduced by the scaling factor. It distinguishes hardware scaling reported through interfaces from controller-side generation of scaled commands. Preserve which method the deployment uses instead of applying a factor blindly at several layers. The controller needs a coherent relation between generated commands and reported robot scaling. Slowing hardware while the controller continues its unscaled reference can create tracking disagreement rather than a properly extended trajectory schedule.
Goal-time tolerance uses the scaled reference
The guide explicitly places goal-time tolerance in virtual trajectory time. The reviewed update loop advances traj_time by the control period multiplied by the scaling factor and derives its tolerance comparison from trajectory progress. This supports a specific interpretation: meeting that tolerance can coexist with longer outside elapsed time. It is not a defect merely because slowing motion extends execution. The application must decide whether that extension is acceptable for its task.
A parameter name does not prove an overall timer
The reviewed parameter page calls action_execution_timeout wall-clock. In the reviewed branch, however, its condition uses traj_time and is gated after the last point. Do not promote that description into a demonstrated overall elapsed-time cutoff before reconciling the implementation. This is a source-review limitation, not a runtime measurement. Inspect the installed revision and the actual comparison variable, including when the check can execute, rather than relying on a timeout parameter’s label alone.
Keep separate progress and elapsed-time traces
Propose a passive controller fixture with a declared scaling sequence and a harmless trajectory. Record unscaled observation time, virtual progress, active tolerances, timeout checks and action outcome. Include a period of strongly reduced progress to expose clock dependence. Acceptance requires the application’s elapsed-time monitor to follow its own declared contract while controller tracking remains interpreted in the scaled reference. No controller or robot was run here. Any reaction involving physical stopping requires separate qualification; a monitor expiry alone is not standstill evidence.
Report which notion of time the outcome satisfies
Request timer boundaries distinguish another family of timing contracts. SmolVLA asynchronous execution separates prediction and action consumption progress. For scaled trajectory execution, retain method, factor history, clock variables and acceptance criteria with the result. A report can then say whether the controller tracked the scaled plan and whether the task met its external deadline, without treating those outcomes as interchangeable or inventing a universal motion-duration guarantee.
Earn rental income from GPUs
Have idle GPUs or looking to fund AI infrastructure? Retrivium finds a rental platform, sets up the server and helps you assess income and costs with a pilot.