﻿# OCP 18 kW PSU: required hold-up and the reserved battery-transition signal

The OCP specification distinguishes a minimum full-load hold-up requirement from reference-only DC-loss signaling. Neither figure is a rack battery-runtime measurement.

Author: Retrivium editorial team
Updated: 2026-11-05
Canonical URL: https://retrivium.ai/journal/ocp-18kw-psu-required-hold-up-reserved-dc-loss-bbu-signal/
Language: en

The [OCP power supply specification](https://www.opencompute.org/documents/hvdc-lvdc-psu-18kw-spec-1-0-0-pdf) for conversion from ±400 V to 50 V describes an 18 kW module. Its revision history identifies the initial release as 20 February 2026. A particularly important reading distinction concerns battery backup: the document separates a hold-up requirement from a reserved signaling description.

## The hold-up requirement has a voltage endpoint

Section 3.15 specifies a minimum hold-up of 6 milliseconds at full load. It defines the interval from loss of the DC input until the output leaves the acceptable 48 V range. That endpoint is more precise than saying the system continues running for a few milliseconds.

The requirement concerns a power supply under its stated load and output condition. It is not a measured result for a particular vendor implementation, an application completion guarantee or the discharge duration of an installed battery shelf. A rack may contain several related power components whose separate limits must all be understood.

## The DC-loss description is explicitly reserved

Section 3.16 marks DC_Loss_L reserved and states that the section is reference material, rather than a requirement. This status is visible before its signal diagram and timing description. Later prescriptive wording inside that section must not silently override the scope label.

The reference scheme describes asserting a signal after a 4–5 millisecond validation delay, or according to remaining capacitor energy sufficient for more than 5 milliseconds of backup ramp-up. It uses alternative triggering conditions. Adding the intervals together as a mandatory sequential delay would misread the described logic as well as its non-required status.

## Signaling and stored energy answer different questions

In the reference description, the battery unit responds by initiating discharge through the synchronization signal. Restoration includes another validation condition. These details illustrate coordination, but they do not establish that a particular supplied module implements the reserved interface or that a complete shelf passed a transition test.

The [OCP Rack and Power inventory](https://www.opencompute.org/projects/rack-and-power/) lists power supplies, shelves and battery units as separate contributions. A compatible system design needs the actual versions and implemented interface of each component. Matching a broad rack architecture name is insufficient to infer every signal or transition behavior.

## Define the evidence needed for a system claim

A useful compliance record identifies mandatory clauses, reference material, load conditions and measurement endpoints. For an implemented transition, it would preserve the input-loss event, output voltage trace, load and battery response together. These are evidence requirements, rather than tests performed here or instructions to modify energized equipment.

The [power and cooling guide](/journal/power-and-cooling/) explains why component specifications and sustained system behavior need separate checks. The [benchmark method guide](/journal/inference-benchmark-method/) provides the corresponding discipline of defining start and finish events. The specification supports a concrete hold-up requirement and an informative transition concept; it does not prove deployed battery autonomy, interruption-free applications or mandatory support for the reserved signal.