﻿# Subagent budgets: pay for evidence that can change the decision

Subagent budgets: pay for evidence that can change the decision. Primary documentation, practical limits and a testable scenario through May 2027.

Author: Retrivium team
Updated: 2026-11-06
Canonical URL: https://retrivium.ai/journal/frontier-space-subagent-marginal-evidence-budget/
Language: en

## More workers spend more than elapsed time

[The subagents guide](https://learn.chatgpt.com/docs/agent-configuration/subagents) explicitly says comparable multi-agent workflows consume more tokens because each worker performs its own model and tool work. Parallelism may shorten a useful investigation, but it does not make the duplicated context free. A cost discussion should identify the completed task and evidence quality, rather than comparing only the speed at which the first answer appears.

## Separate useful specialization from duplication

Two workers checking different failure modes can contribute complementary evidence. Two workers rereading the same material under the same unsupported assumption may add little. Preserve the reason each branch exists and what decision its output can change. A long final synthesis can also consume work after specialists finish. The whole workflow, including reconciliation, is the relevant unit when deciding whether delegation helped.

## Hold the acceptance target stable

[Evaluation guidance](https://developers.openai.com/api/docs/guides/evaluation-best-practices) recommends letting evaluations drive the choice of multi-agent architecture. A faster answer that omits a requested branch is not the same task. Likewise, a more detailed result may require more work but reveal a consequential defect the shorter baseline missed. Compare completed coverage, correctness and unresolved limitations before interpreting resource use. Do not infer a universal economical configuration from one attractive example.

## Evaluate the marginal branch

Our proposed exercise adds one specialist to a harmless fixed review and asks what additional verified conclusion the branch contributes. Record duplicated findings and synthesis errors as well as useful discoveries. The [benchmark methodology guide](/journal/inference-benchmark-method/) explains fixed-work comparisons; the [task-contract article](/journal/learn-codex-task-contract/) defines the acceptance target. No token totals, monetary savings or wall-clock gains are invented here; the documentation supplies the qualitative cost boundary.

## Capability scenario through May 2027

A stronger coordinator could estimate the decision value of another branch and stop expanding when expected evidence is redundant. This is our scenario, not an announced optimal cost controller. It requires tracking unresolved questions and the scope of existing evidence. Repeatedly launching equivalent workers while missing synthesis failures would be counterevidence. The useful advance is resource-aware completion of a fixed objective, with more effort reserved for uncertainty that can change the outcome rather than a reflexive increase in agent count.
