﻿# MIG geometry can strand capacity even when total free memory looks sufficient

Compare MIG partition geometries through accepted request classes, supported placements and the resource interval needed to change the geometry.

Author: Retrivium team
Updated: 2026-11-06
Canonical URL: https://retrivium.ai/journal/field-econ-mig-geometry-stranded-request-capacity/
Language: en

## Unused slices do not form a larger instance

A partitioned accelerator has idle small instances while a larger model request waits. Their combined memory appears sufficient in a dashboard, but the required execution profile is unavailable. The resource question is which supported geometry serves the intended mix with acceptable stranded capacity. This is not a recommendation to reconfigure a shared device live. Any change must respect active workload ownership and the platform's actual lifecycle, including time when the intended service cannot use the device.

## Read supported placements rather than inventing a byte pool

The [NVIDIA MIG guide](https://docs.nvidia.com/datacenter/tesla/mig-user-guide/getting-started-with-mig.html) documents profile placements and creation of GPU and compute instances. [Kubernetes GPU scheduling](https://kubernetes.io/docs/tasks/manage-gpus/scheduling-gpus/) describes advertised resource requests and placement constraints. Preserve the physical device, supported profiles, actual instances and scheduler-visible resources. Availability of a profile on another accelerator does not establish support here. An idle instance is not automatically resizable memory belonging to another instance, and a scheduler resource count does not independently prove model readiness or workload compatibility.

## Build a profile-to-task matrix

Identify required request classes and verify each model configuration on the eligible profile. Preserve context, output checks and bounded concurrent lifetimes. Mark unsupported combinations explicitly. Then replay a fixed portfolio against the current geometry and another approved geometry in a controlled equivalent. Keep arrival schedules and total device inventory matched. Report both class-level acceptance and idle instance resources. Avoid comparing only the best-fitting tasks of each geometry, because that silently changes the portfolio being served.

## Include the geometry transition

Record admission closure, drain, instance changes, worker preparation and reopening as separate events under the supported procedure. Measure unavailable serving intervals and retained or lost work. If an alternative geometry requires interrupting workloads that cannot be interrupted under the service rules, classify it as ineligible. A favorable steady-state packing result cannot pay away that constraint. Preserve scheduler and device observations after the change so the tested configuration is the actual geometry, not only the intended manifest.

## Test a shifted portfolio

Include a schedule where a larger-profile class becomes dominant, and another where many smaller eligible jobs arrive together. The preferred geometry can depend on this mix, so show stranded resources and missed requirements by class. Do not assume a future mixture from the synthetic test. Also verify startup after the selected lifecycle event because configuration persistence depends on the platform procedure. Missing instances after a reset are unavailable capacity, not a low-utilization efficiency improvement or a successful zero-resource service.

## Publish a geometry-specific resource choice

Save task-profile compatibility, placements, transition duration, idle instances and accepted work. [GPU sharing modes](/journal/gpu-mig-vs-time-slicing/) explains partitioning versus time slicing, while [capacity planning](/journal/inference-capacity-planning/) establishes the workload boundary. This article adds a geometry-level economic comparison with stranded profiles and transition eligibility. It does not claim universal isolation, automatic elastic merging or an optimal profile layout for every model; the choice remains tied to the demonstrated service mix and supported device configuration.
