﻿# Flyte 2 reports: a visible progress chart is not yet the final evaluation result

Separate streamed Flyte 2 HTML reports from typed task outputs and final model metrics, preserving completion state, coverage and the artifact that supports a chart.

Author: Retrivium editorial team
Updated: 2026-11-04
Canonical URL: https://retrivium.ai/journal/fg2-flyte-two-report-progress-versus-final-metric/
Language: en

## A chart appears before the hard examples finish

A model evaluation streams an HTML chart while it processes documents. The chart looks convincing after the easy examples complete, so someone shares its screenshot as the final quality result. Later the task fails or evaluates a different remaining population. The screenshot preserved a real intermediate observation, but its meaning was overstated.

Label progress explicitly and keep the completed population visible. A live chart can support diagnosis without claiming that all requested examples have contributed. Its presentation should make the current stage understandable independently of visual polish.

## Reports support updates during execution

The [Flyte 2 report guide](https://www.union.ai/docs/v2/flyte/user-guide/tasks/task-programming/reports/) describes HTML tabs, appending or replacing content, explicit updates and the final automatic flush of reporting-enabled tasks. Updating the report is a presentation operation, not an independent proof of complete evaluation coverage.

For the live chart, state whether values are partial, provisional or final. Preserve the inputs and aggregation definition that produced the displayed values. A successful report update does not imply that subsequent model work has succeeded.

## Typed task outputs provide another contract

The [task guide](https://www.union.ai/docs/v2/flyte/user-guide/get-started/core-concepts/tasks/) explains typed inputs and outputs. Return machine-readable evaluation results deliberately rather than expecting another task to scrape the HTML chart. The report can explain those results while the output carries their structured identity and fields.

Use [explicit schema contracts](/journal/data-guide-frictionless-table-schema/) for that output. A field named accuracy still needs an evaluation population and status. The schema should distinguish a completed measurement from an in-progress accumulation.

## Keep report retention connected to underlying evidence

The [data location guide](https://www.union.ai/docs/v2/flyte/user-guide/get-started/core-concepts/where-data-lives/) describes report payloads and stored task values. A screenshot alone does not retain the model, input dataset or structured metric used to generate a chart. Link the rendered view to those artifacts in the experiment record.

This relationship matters after a model or dataset is revised. An attractive historical chart should remain interpretable as an observation of a particular version, rather than being assumed to describe the current system automatically.

## Verify how partial execution is shown

Exercise an interrupted evaluation and inspect the report alongside task status and structured outputs. Confirm that readers can see whether the presented metric covers the full intended population.

[Success denominator selection](/journal/provider-stream-success-sli-denominator/) offers a related principle: excluded or unfinished observations change meaning. Reporting makes progress visible; explicit result contracts make the final claim reviewable.
