﻿# A historical UPS comparison at 360 W: runtime and workload boundaries

The archived comparison gives real battery runtimes, but its DOS memory test and historical battery preparation limit its use for a modern GPU node.

Author: Retrivium editorial team
Updated: 2026-11-05
Canonical URL: https://retrivium.ai/journal/benchmark-reviews-2010-ups-runtime-360w-memtest-boundary/
Language: en

## The archive supplies a date and a test procedure

The [Benchmark Reviews UPS comparison](https://archive.techplayboy.com/reviews/cyberpower-ups-battery-backup-for-pcs.html), preserved by TechPlayboy, is dated March 3, 2010. It compares several battery backups on a common high-performance PC configuration, labeled a 360 W load. The PC includes a Radeon HD5970 dual-GPU card and an overclocked processor, with a monitor inside the protected equipment boundary.

Crucially, the stated PC procedure runs MemTest 86+ in DOS mode. The presence of a dual-GPU graphics card does not turn that procedure into a sustained graphics or modern AI accelerator workload. The measured result belongs to the described system and test state.

## Preserve the observed runtime table

The high-performance-PC table reports:

| UPS | Battery runtime |
| --- | --- |
| CyberPower CP1500AVRLCD | 15:40 |
| Tripp Lite OMNIVS1500 | 14:35 |
| APC BR1500LCD | 13:20 |
| Tripp Lite SMART1500LCD | 12:55 |
| Powercom BNT-1500AP | 12:00 |

Times are minutes and seconds from removal of mains power until the system switches off. These are the reviewer’s historical observations, not present-day manufacturer runtime guarantees. A table entry cannot establish the condition of a second-hand unit now bearing the same product name.

## Battery preparation was described, but condition remains bounded

The reviewer charged each UPS without a connected load for at least 24 hours. Units were purchased or received within thirty days of testing, but the battery manufacturing dates were not visible. That establishes a preparation procedure without establishing identical battery age or storage history.

The current [Schneider Electric battery FAQ](https://www.se.com/us/en/faqs/FA158934/) explains that temperature, storage, load and discharge history affect battery life and runtime. It also cautions against frequent deep discharge. These considerations provide reasons to retain condition evidence; they do not supply a correction factor that converts the old measurements into a new installation’s guaranteed minutes.

## Runtime and load capacity are different acceptance questions

A UPS must support its connected equipment, but a power rating alone does not describe its stored usable energy or the duration of a particular load. The old table is valuable precisely because it compares actual elapsed operation under one declared scenario rather than deriving minutes from a rating.

However, the review does not provide a detailed power trace or transient-load characterization for that PC case. A nominal load label cannot establish how a modern accelerator system behaves during startup, active inference or a sudden change in demand. Nor does successful operation of the historical power supply establish compatibility with every current supply and battery-output waveform.

## Translate the example into a shutdown budget

For an inference node, the relevant requirement may be time to detect an outage, stop admitting work, save required state and shut down. The [UPS recovery-budget guide](/journal/ups-runtime-recovery-budget/) separates that battery window from the later cold restart. A longer measured discharge time is not automatically more useful than a verified procedure that finishes before the reserve expires.

Retain the exact UPS and battery configuration, protected equipment, current condition and load-specific runtime source. A historical self-test or a freshly queried status string supplies another kind of evidence, as the [NUT test-result guide](/journal/guide-dc-ups-test-result/) explains. This named comparison remains a useful example of measured runtime differences; it does not replace validation of the current protected system.
